Multimodal Exchange Hub Lyon Part-Dieu

Project

With the completion of the new Béraudier Gallery in June 2024, the station is preparing to begin the renovation of HALL 1. This project, led by SNCF Gares et Connexions and with AREP as the design and project management firm, will transform the user experience by creating a renovated space that enhances comfort and accessibility.

In the heart of Lyon, Part-Dieu station is evolving to become a more welcoming and functional place. The scope of the work includes significant improvements to waiting comfort, easier access to information, optimized passenger flow, and the creation of a cohesive architectural ensemble.

Mission

setec opency is responsible for the Scheduling, Construction Management and Coordination (SCMC) mission during the design phase, alongside a Technical and Environmental Assistance mission to address the impacts of the works from the design stage and thus minimize their footprint.

dsc04724-min

Expertises

Also discover in "Manager des projets"

Restructuring of the West Extension of Roland Garros Airport

Restoration of Notre-Dame Cathedral in Paris

Renovation of the Loubet Tower in Saint-Étienne