visuel générique projet

Propriano bay waste treatment plant outfall

Missions

o Wave model simulations
o Hydrodynamic forces calculation
o Structural constraints verification

The Sartenais-Valinco conurbation community entrusted to the company Corse Travaux Maritimes the implementation of the Propriano waste treatment plant’s outfall off the coast of Capo Lauroso in Corsica (southeast of the French mainland).
Setec led the construction design and calculation of hydrodynamic forces, which enabled to carry out the tests.

Also discover in "Environment"

Ex-ante evaluation of the BeMed project: working towards a plastic-free Mediterranean Sea

MOP-ALFOWT

Ashegoda Wind Farm